Where will be the electron microscopy facility relocated?
  • No answer to this question yet... No solution found if the vibrations caused by construction prevent the use of electron microscopes...
  • Contact(s)
    André Le Bivic ibdm-direction@univ-amu.fr
    Nicolas Brouilly nicolas.brouilly@univ-amu.fr
List of common rooms and equipment and their respective responsible persons after the relocation?
  • A file has been drawn up regarding common rooms, equipment and responsabilities.
    This document may be changed/modified during the next few months.
  • Document(s)
  • Contact(s)
    Frédéric Leroy frederic.leroy.2@univ-amu.fr
Where will the administrative department be located during the construction work?
  • During the AMU work phase, from January 2019 to August 2020, the administrative service will be moved to the 4th floor of the TPR2 on the CNRS side (block4), the current CPT library.

    As from August 2020 it will be located in its final position: block1 6th floor TPR2 (purple on building plan)
  • Document(s)
  • Contact(s)
    André Le Bivic ibdm-direction@univ-amu.fr
Where will be the qPCR platform?
  • During the first phase of the work the qPCR platform does not move.
    From August 2020 it will be moved to Block 1 on the 7th floor.
    There will be no qPCR machines in the modules (BP1).
  • Document(s)
  • Contact(s)
    Ahmed Fatmi ahmed.fatmi@univ-amu.fr
Where will the IT department be located during the work?
  • From November 2018 to August 2020, the IT department will be located at the 4th floor of TPR2 block 4 (CNRS), at the place of the current CPT library.
    From August 2020 the service will be at the 6th floor of the TPR2 block 1, where they will stay after the work is completed.
  • Document(s)
Will there be a staff cafeteria in the modular buildings? What about the access to the Sogeres from the BP1?
  • During phase 1 (AMU side renovation), a cafeteria will be available in the modular buildings.
    During phase 2 (CNRS side renovation), too many teams will move to the modular building, there will be no space for a cafeteria.

    The Sogeres will not be renovated during phases 1 and 2. It will be accessible for staff.